Fractionation

CECON operates a 35,000 GPD fractionator in Craig,
Colorado making 
Propane, Butane, and Natural Gasoline from
Y-Grade type NGL's. The plant has  188,000 gallons of
pressurized storage. Raw products are unloaded utilizing a
vapor compressor. Transports can unload in 60 minutes.
Finished products can be loaded by pump or by vapor
compression. Loading times very from 45 minutes for 

Gasoline to 75 minutes for Butane. Product volumes are 
determined by scales and a chromatograph is available for 
product analysis.